Images-loading
                                                                           2017-2018 Academic Year
                                                                               Graduation Thesis Title

No Roll No. Title Remark
1 VI.C-1 Investigation of High Wind Effect on Twelve-Storeyed Reinforced Concrete Building Structure
2 VI.C-2 Study on Planning and Scheduling of Substructure for Myo Soe Bridge Construction Management
3 VI.C-3 Steel Trusses Under Various Wind Loading Condition Structure
4 VI.C-4 Investigation of High Wind Effect on Twelve-Storeyed Reinforced Concrete Building Structure
5 VI.C-5 Study on Planning and Scheduling of Four-Storeyed R.C Building Management
6 VI.C-6 Study on Planning and Scheduling of Superstructure for Myo Soe Bridge Construction Management
7 VI.C-7 Analysis and Design of Seven-Storeyed R.C Building with Flat Slab Structure
8 VI.C-8 Design of Solid Waste Management for Selected Township in Yangon Environmental
9 VI.C-9 Study on Planning and Scheduling ofTwo-Storeyed R.C Building Management
10 VI.C-10 Planning and Scheduling of Four-Storeyed Proposed R.C Building Management
11 VI.C-11 Steel Trusses Under Various Wind Loading Conditions Structure
12 VI.C-12 Design of Traffic Signals on the Intersection of U Wisara Road and Dhammazed Road Transportation
13 VI.C-13 Design of Isolated and Strip Footing for Three-Storeyed Building in Mayangone Geotech
14 VI.C-14 Analysis and Design of Seven-Storeyed R.C Building with Flat Slab Structure
15 VI.C-15 Analysis and Design of Residential Building Structure
16 VI.C-16 Study on Project Budget Management and Financial Control for Construction Management
17 VI.C-17 Analysis and Design of Three-Storeyed R.C Building Structure
18 VI.C-18 Study on Effect of Ingredient Propotion on Concrete Proporties Material
19 VI.C-19 Study on Employee's Safety and Health at Workplace Management
20 VI.C-20  Study on Flexible Pavement Design of Yangon-Mandalay Pyitaung-Su Highway Road Transportation
21 VI.C-21 Seismic Evaluation of Existing Building in Selected Areas in Latha Township Structure
22 VI.C-22 Study on Project Management in Confectionary Factory Project Management
23 VI.C-23 Groundwater Treatment Process for Selected Area in Hlaing Thayar Township Environmental
24 VI.C-24 Design Comparison of Five-Storeyed R.C Building with Hand and Etabs Structure
25 VI.C-25 Analysis and Design of Eight-Storeyed R.C Building Structure
26 VI.C-26 Analysis and Design of Six-Storeyed R.C Building Structure
27 VI.C-27 Seismic Evaluation of Existing Building in Selected Areas in Latha Township Structure
28 VI.C-28 Design and Analysis of Braced Tower Supporting Water Tank (Variable Soil) Structure
29 VI.C-29 Study on Planning and Scheduling of Two-Storeyed R.C Building Management
30 VI.C-30 Study on Planning and Scheduling of One-Storeyed Industrial Construction Management
31 VI.C-31 Planning and Scheduling of Hanger Supporting Building Management
32 VI.C-32 Design of Solid Waste Management for Selected Township in Yangon Environmental
33 VI.C-33 Comprative Study of R.C Structure Under Various wind Loading Condition Structure
34 VI.C-34 Design and Analysis of Braced Tower Supporting Water Tank (Variable Soil) Structure
35 VI.C-35 Study on Material Planning for Eight-Storeyed Residential Building Management
36 VI.C-36 Analysis and Design of Eight-Storeyed R.C.C Building Structure
37 VI.C-37 Study on Planning and Scheduling of Two-Storeyed  Residential Building Management
38 VI.C-38 Study on Elements of Construction Project Delays Management
39 VI.C-39 Structural Analysis and Design for Three-Storeyed R.C.C Structure
40 VI.C-40 Overview of Material Management Process in Construction Management
41 VI.C-41 Study on Planning and Scheduling of Two-Storyed R.C Building Management
42 VI.C-42 Study on Risk Management of Thar Kay Ta Bridge Construction Management
43 VI.C-43 Study on Air Pollution for Selected Area in Yangon Environmental
44 VI.C-44 Study on Planning and Scheduling of Three and Half-Storeyed  Residential Building Management
45 VI.C-45 Safety management  in residential building Management
46 VI.C-46 Safety management  for Fire Station Management
47 VI.C-47 Safety and Risk Management for Bounded Ware House Management
48 VI.C-48 Comparative Study of R.C Structure Under Various Wind Loading Condition Structure
49 VI.C-49 Study on Material and Manpower Planning For Construction Management
50 VI.C-50 Study on Planning and Scheduling of Three-Storeyed R.C Building Management
51 VI.C-51 Planning and Scheduling for Press Pile Construction Management
52 VI.C-52 Study on Seismic Performance Comparison of Six-Storeyed R.C Building in Seismic Zone IIA and III Structure
53 VI.C-53 Analysis of Residential Solid Waste Composition for Selected Township in Yangon Environmental
54 VI.C-54 Design of Spillway in Ngamoeyeik Dam Water Resources
55 VI.C-55 Analysis and Design of Three-Storeyed R.C Building Structure
56 VI.C-56 Study on Safety Management System Management
57 VI.C-57 Construction of Highway Subgrade Structure for Thilawa Special Economic Zone B Transportation
58 VI.C-58 Study on Safety Management System for Construction Project Management
59 VI.C-59 Design Comparison of Five-Storeyed R.C Building with Hand and Etabs Structure
60 VI.C-60 Study on Performance of member effect Due to decreasion of Concrete Compression Strength Structure
61 VI.C-61 Investigation of High Wind Effect on Twelve-Storeyed Reinforced Concrete Building Structure
62 VI.C-62 Study on Influence of Column Arrangement in Design of Multi-Storeyed R.C Building Structure
63 VI.C-63 Comparative Study of R.C Structure Under Various Wind Loading Condition Structure
64 VI.C-64 Design of Bored Pile Foundation for Highway Bridge by using Specifications for Highway Bridge(JSHB) Geotech
65 VI.C-65 Analysis and Design of School-cum Shetter Structure
66 VI.C-66 Structural Analysis of Eight-Storeyed Building Structure
67 VI.C-67 Analysis and Design of Two-Storeyed R.C Building Structure
68 VI.C-68 Design and Analysis of Various Slab Structure
69 VI.C-69 Study on Safety Performance for Construction Site Management
70 VI.C-70 Analysis and Design of Six-Storeyed R.C Building Structure
71 VI.C-71 Analysis and Design of Superstructure for Eight-Storeyed R.C Building Structure
72 VI.C-72 Analysis and Design of Eight-Storeyed R.C Building Structure
73 VI.C-73 Design and Analysis of Five-Storeyed R.C Residential Building Structure
74 VI.C-74 Design and Analysis of Four-Storeyed R.C Building in Thayet Structure
75 VI.C-75 Analysis and Design of Two-Storeyed R.C Building Structure
76 VI.C-76 Design of Traffic Signals (Case Study: Intersection of Phone Gyi Road and Bogyoke Road) Transportation
77 VI.C-77 Study on Quality Management of High-Rise Building in Construction Management
78 VI.C-78 Study on Strategic Human Resource Management in Construction Management
79 VI.C-79 Comparative Study of R.C Structure Under Various Wind Loading Condition Structure
80 VI.C-80 Study on Wastewater Tratement System and Design of Wastewater Tratement Environmental
81 VI.C-81 Design of Flexible Pavemennt of Tite Gyi-Outo- Chaung Thone Kwa-Aphyoute Road Transportation
82 VI.C-82 Steel Trusses Under Various Wind Loading Condition Structure
83 VI.C-83 Design and Analysis of Four-Storeyed R.C Building in Thayet Structure
84 VI.C-84 Design of Precast Concrete Pile Foundation for Eight and Half-Storeyed R.C Building Geotech
85 VI.C-85 Study on Performance of member effect Due to decreasion of Concrete Compression Strength Structure
86 VI.C-86 Study on Production of Precast Concrete (Box System) Material
87 VI.C-87 Design of Spillway in Kanyin Dam Water Resources
88 VI.C-88 Green Building in Yangon Environmental
89 VI.C-89 Analysis and Design of Six-Storeyed R.C.C Building Structure
90 VI.C-90 Analysis of Solid Waste Management in Latha and Lanmadaw Township Environmental
91 VI.C-91 Study on Planning and Scheduling of Two-Storeyed Residential Buildingn Management
92 VI.C-92 Analysis and Design of Isolated and Combined Footings Geotech
93 VI.C-93 Study on Planning and Scheduling of Three-Storeyed R.C Building Management
94 VI.C-94 Study on Effect of Lateral Force on R.C.C Building Structure
95 VI.C-95 Analysis of Canals and Design of Main Canal Structure at Kadike Dam Water Resources
96 VI.C-96 Groundwater Treatment Process for Selected Area in Hlaing Thayar Township Environmental
97 VI.C-97 Study on Manpower and Machine Planning for Thar Kay Ta Bridge Construction Management
98 VI.C-98 Investigation of High Wind Effect on Twelve-Storeyed Reinforced Concrete Building Structure
99 VI.C-99 Study on Construction Process of Bored Pile Foundation Geotech
100 VI.C-100 Analysis of Solid Waste Management in Sanchaung and Kyimyindaing with Landfill (area method) Environmental
101 VI.C-101 Study on Health and Safety in Construction Site Management
102 VI.C-102 Analysis and Design of Eight-Storeyed Commercial R.C Building Structure
103 VI.C-103 Comparative Study on Design of Mat and Isolated Footing Geotech
104 VI.C-104 Residential Solid Waste Management for Selected Area in Thibgangyun Environmental
105 VI.C-105 Wastewater Treatment Plant in Insein Township Environmental
106 VI.C-106 Detail Design of Spetic Tank Environmental
107 VI.C-107 Study on Construction Safety and Health Management
108 VI.C-108 Analysis and Design of Eight-Storeyed Commercial R.C Building Structure
109 VI.C-109 Study on Resource Planning of Bored Pile Management
110 VI.C-110 The Study of the Wastewater Purification Process in Sewage Treatment Plant at Thilawa SEZ by using Conventional Treatment Method Environmental
111 VI.C-111 Seismic Evaluation of Existing Building in Selected Areas in Latha Township Structure
112 VI.C-112 Design and Analysis of Various Slab Structure
113 VI.C-113 Study on Safety Management in Construction Site Management
114 VI.C-114 Design of Isolated and Combined Footing for Five-Storeyed R.C.C Building Geotech
115 VI.C-115 Analysis and Design of Multi-Storeyed R.C Building by using Etabs Structure
116 VI.C-116 Design and Analysis of Single Storeyed R.C.C Hall Type Building with Circular arched Slab Structure
117 VI.C-117 Study on Planning and Scheduling of Three-Storeyed Residential Building Management
118 VI.C-118 Study on Planning and Scheduling of Two-Storeyed R.C Building Management
119 VI.C-119 Design and Comparison of Five-Storeyed R.C Building with Hand and Etabs Structure
120 VI.C-120 Study on Planning and Scheduling of Eight-Storeyed R.C Building Management
121 VI.C-121 Design of Drainage Syatem for Selected Area in South Okkalapa Environmental
122 VI.C-122 Case Study of Structural Analysis of Hotel Structure
123 VI.C-123 Design of Solid Waste Management for Selected Township in Yangon Environmental
124 VI.C-124 Design of Isolated footing and Combined Footing for Two-Storeyed R.C.C Building Geotech
125 VI.C-125 Study on Safety Management for Steel Structure Building Management
126 VI.C-126 Study on Planning and Scheduling of Two-Storeyed R.C Building Management
127 VI.C-127 Design of Spetic Tank Environmental
128 VI.C-128 Design of Solid Waste Management for Selected Township in Yangon Environmental
129 VI.C-129 Steel Trusses Under Various Wind Loading Condition Structure
130 VI.C-130 Study on Design of Precast Concrete Spun Pile for Bounded Ware House Geotech
131 VI.C-131 Study on Occurrence of Construction Risks Management
132 VI.C-132 Study on Integrating Health and Safety for Construction Management
133 VI.C-133 Study on Planning and Scheduling of Three-Storeyed Steel Structure Building Management
134 VI.C-134 Study on the Impact of Owner's practice and procedures on Construction Safety Performance Management
135 VI.C-135 Effectiveness of Risk in Construction Management
136 VI.C-136 Study on Planning and Scheduling of Two-Storeyed R.C Building (Store and Workshop) Management
137 VI.C-137 Design of Spillway in Ma Mya Dam Water Resources
138 VI.C-138 Design of Pile Foundation for R.C.C Building Geotech
139 VI.C-139 Design of Spetic Tank and Sewage System Environmental
140 VI.C-140 Analysis and Design of SuperStructure for Eight and Half-Storeyed Structure
141 VI.C-141 Climate Change Impacts on Irrigation Water Requirements in Myinmu Township by Pyortywar Project Water Resources
142 VI.C-142 Study on Safrty Management for Management
143 VI.C-143 Study on Time Planning and Steel Structure Technique for Mottama Building Management
144 VI.C-144 Analysis of Twenty-Storeyed Building with and without Shear Wall Structure
145 VI.C-145 Study on Planning and Scheduling of Two-Storeyed R.C Building Management
146 VI.C-146 The Effect of Admitxure on concrete Material
147 VI.C-147 Design of Solid Waste Management for Selected Township in Yangon Environmental
148 VI.C-148 Study on Structural Behaviours of Six-Storeyed R.C Building with various Wind Speed Structure
149 VI.C-149 Portal Frame Desing with Connection Structure
150 VI.C-150 Labour and Machine Management of Mya Watt Yee Road Construction Management
151 VI.C-151 Study on auto clanved aerated concrete brick Material
152 VI.C-152 Comparative Study of R.C Structure Under Various Seismic Zones (Magwe, Yangon, Than Lwin) Structure
153 VI.C-153 Labour and Material Planning for Fire Station Management
154 VI.C-154 Planning and Scheduling of Three and Half-Storeyed R.C Building Management
155 VI.C-155 Analysis of Water Quality for Pazundaung Creek Water Resources
156 VI.C-156 Study on Design of Precast Concrete Square Pile for Bonded House Geotech
158 VI.C-158 Portal Frame Design with connection Structure
159 VI.C- 159 Canal Structures Design in Hlegu Township Water Resources
160 VI.C- 160 Experimental Study of Cohesive Soil Stabilized with Lime Geotech
161 VI.C- 161 Invertigation on earthquake performance of 6storeyRC building Structure
162 VI.C- 162 Design Comparison of Fore-storeyed RC building with Hand &ETABS Structure
163 VI.C- 163 Study on Risk Management in shwe Naung Pin Construction project Management
164 VI.C- 164 Structure analysis of Deck Slab for bridge(KA MAR KYI) Structure
165 VI.C- 165 Study on Design of Isolated and Combined Footing for three Storeyed Building in S/O Geotech
166 VI.C- 166 Water Supply and sewage system Environmental
167 VI.C- 167 Analysis & Design of Two-Storeyed RC Building Structure
168 VI.C- 168 Emergency Response Plan for Yeywa Dam Water Resources
169 VI.C- 169 Design & analysis of timber Formwork Structure
170 VI.C- 170 Analysis of 2- 1/2 storey Shape RC Building Structure
171 VI.C- 171 Time planning for Thirteen Storeyed RC Building Management
172 VI.C- 172 same title with VIC-52 Structure
173 VI.C- 173 Material Planning of Mya Wutt Yee Road Construction Management
174 VI.C- 174 Material Planning for Eight and Half Storeyed RC Building Management
175 VI.C- 175 Analyzing Water Distribution Network Design for Myothit Quarter (Insein Township) Water Resources
176 VI.C- 176 Storey on Resourse Planning for Two Storeyed R.C Building Management
177 VI.C- 177 Analysis and Design of 3 storey RC building with Strap and Mat in Hlaing Tharyar Structure
178 VI.C- 178 Seismic Evaluation of Existing building in selected areas in latha Township Structure
179 VI.C- 179 Study on Health and Safety Managnment in construction Management
180 VI.C- 180 Quality control for material and Labour of East Wing Project Management
181 VI.C- 181 Analysis and Design of 6 storey RC  Structure with Strap and Map Structure
182 VI.C- 182 Study on Material planning for construction Management
183 VI.C- 183 Analysis of Hydraulic Jump and Energy Dissipation in Nga Moe Yeik Dam Water Resources
184 VI.C- 184 Analysis and Design of superstructure for 6th storey R.C.C building Structure
185 VI.C- 185 Study on Accident Analysis in construction Management
186 VI.C- 186 Sewer system of Sanchaung Resisdence Environmental
187 VI.C- 187 Reservoir Operation Study at Ngamoeyeik Reservoir Water Resources
188 VI.C- 188 same title with VIC-52 Structure
189 VI.C- 189 Design Construction of rigid pavement for No.7 Road, East Dagon Tsp Transportation
190 VI.C- 190 Study on Risk management in construction projects Management
191 VI.C- 191 Design and Analysis of 6 storey R.C building with Etab Structure
192 VI.C- 192 Study on Slope Stability Analysis for Embankment in North Dagon Township Geotech
193 VI.C- 193 Design of Isolated and Combined Footings for Two-Storeyed Building Geotech
194 VI.C- 194 Analysis Design of Two-Storeyed RC Building Structure
195 VI.C- 195 Portal Frame Design with connection Structure
196 VI.C-196 Analysis and Design of superstructure for 6th storey R.C.C building Structure
197 VI.C-197 Study on influence of chemical admixture on concrete properties Material
198 VI.C-198 Analysis and Design of 3 storey RC building with Strap and Mat in Hlaing Tharyar Structure
199 VI.C-199 Experimental study on Unconsolidated Undrained TrianialTest and Modified Compaction Test for South Dagon and Ahlone Soil Geotech
200 VI.C-200  Design Construction of Rigid Pavement for Kat Thar-Aung Zay ya Road Transpotation
201 VI.C-201 Solid waste management for selected Township in yangon Enviromental
202 VI.C-202 Analysis of 12 storey Shape R.C Buiding Structure
203 VI.C-203 Study on Precast concrete mix design for Residential Building Material
204 VI.C-204 Study on Health and Safety in working enviroment for construction Management
205 VI.C-205 Study on Employee's safety and Health in constuction Project Management
206 VI.C-206 Study on Risk Management in construction project Management
207 VI.C-207 Analysis & Design of Two Storeyed R C Building Structure
208 VI.C-208 Scheduling for Eight unit Six Storeyed Residential Building Management
209 VI.C-209 Analysis of Kadaik Dam Safety Water Resources
210 VI.C-210 Water supply system of Sanchang Residence Enviromental
211 VI.C-211 Analysis & Design of Two Storeyed R C Building Structure
212 VI.C-212 Design and Earthwork Volume Calculation of Irrigation Canal for Latpan Lift Irrigation Project (Kin Mon Chone) Water Resources
213 VI.C-213 Design of Bored pile foundation for Kamar Kyi NO-2 Bridge Structure
214 VI.C-214 Distribution of water and sewage system design for 6th storeyed building Enviromental
215 VI.C-215 Design of Isolated Footing and Strip Footing for Three-Storeyed R.C.C Building in Hlaing Thar Yar Tsp Geotech
216 VI.C-216 Study on Risk Management in construction project Management
217 VI.C-217 Study on Planning and Scheduling of Three storeyed R C Building  Management
218 VI.C-218 Study on Planning and Scheduling of Two storeyed R C Building  Management
219 VI.C-219 Design of water supply and plumbing system Enviromental
220 VI.C-220 Design of water treatment for selected area in Bago Enviromental
221 VI.C-221 Analysis and Design of Roof Truss Structure
222 VI.C-222 Detail design of septic tank Enviromental
223 VI.C-223 comporative study of 8 storey RC structure under various seismic zones Structure
224 VI.C-224 Domestic wastewater treatment system in (IBC ( IBAC)) condominium at Thingangyun Enviromental
225 VI.C-225 Construction of Highway subgrade structure at Pha Yar Gyi- Baw nat Gyi-Zhaung Tu Tite Gyi Road Transpotation
226 VI.C-226 Experimental study on High Strength concrete Material
227 VI.C-227 study on properties of self Compacting concrete Material
228 VI.C-228 Analysis of Seepage of Earth Dam for Ngamoeyeik Water Resources
229 VI.C-229 Design of Sluice Gate in selected region in Yangon Water Resources
230 VI.C-230 Design of septic tank Enviromental
231 VI.C-231 Design of Septic tank for residential building Enviromental
232 VI.C-232 Analysis and Design of Six storeyed RC building Structure
233 VI.C-233 Study on Precast Pile Foundation Design for 8-1/2 Storeyed R.C.C Building in Thingangyun Township Geotech
234 VI.C-234 Study on Soil Testing using Dynamic Cone Penetration and Electrial Density Gauge Geotech
235 VI.C-235 Analysis of  Solid Waste Composition and Energy Recovery for Selected Townships in Yangon Environmental
236 VI.C-236 Study on Detemination of Liquefaction Potential of Cohesionless Soil Geotech
237 VI.C-237 Study on Labour Planning in Condominium Construction Management
238 VI.C-238 Study on Planning and Scheduling of Three Storeyed R.C Building Management
239 VI.C-239 Study on Planning and Scheduling of Two Storeyed R.C Building Management
240 VI.C-240 Planning and Scheduling of Four Storeyed R.C Building Management
241 VI.C-241 Study on Risk Assessment in Construction Projects Management
242 VI.C-242 Structural Analysis of Prestressed Concrete Girder in Bridge Structure
243 VI.C-243 Design of Wate Tank Structure
244 VI.C-244 Study on Design of Isolated and Combined Footing for Two Storeyed Building Geotech
245 VI.C-245 Study on Health and Safety Management in Construction Project Management
246 VI.C-246 Study on Health and Safety Management in Construction Project Management
247 VI.C-247 Analysis and Design of Six Storeyed R.C Structure with Mat and Strap Structure
248 VI.C-248 Study on Safety Management for High-rise Construction Management
249 VI.C-249 Study on Health and Safety Management for Highway Project Management
250 VI.C-250 Design of Drainage System Environmental
251 VI.C-251 Study on Pile Foundation Planning of Eight and Half Storeyed Residential Building Management
252 VI.C-252 Study on Design of  Bored Pile Foundation Geotech
253 VI.C-253 Study on Construction Safety and Health Management
254 VI.C-254 Structural Analysis of 100ft Suspension Bridge Structure
255 VI.C-255 Design and Analysis of Three Storeyed R.C Building
(Foundation Type 2)
Structure
256 VI.C-256 Land Consolidation and Irrigation Project on Mechanized Farming in Letpadan Township Water Resources
257 VI.C-257 Study on Planning and Scheduling of Nine Storeyed R.C Building (Superstructure) Management
258 VI.C-258 Design of Septic Tank for Six Units Toilet Environmental
259 VI.C-259 Structural Analysis and Design of Two Storeyed Mini Mart R.C Building Structure
260 VI.C-260 Design Comparison of Five Storeyed R.C Building with Hand and ETABS Structure
261 VI.C-261 Analysis and Design of Retaining Wall in Tedim and Mindat Structure
262 VI.C-262 Water Supply and Demand for Summer Paddy (Nga Moe Yeik) Water Resources
263 VI.C-263 Concrete Mix Design Material
264 VI.C-264 Absent  
265 VI.C-265 Study on Delaying Activites in Construction Project Management
266 VI.C-266 Analysis and Design of Six Storeyed R.C Building Structure
267 VI.C-267 Analysis and Design of Eight Storeyed R.C Building Structure
268 VI.C-268 Experimental Study on Properties of Soil for Road Construction in Nyaungdon Township Geotech
269 VI.C-269 Study on Different Types of Concrete Grade Testing Material
270 VI.C-270 Watersupply and Plumbing System Environmental
271 VI.C-271 Study on Planning and Scheduling of Two and Half Storeyed Building Management
272 VI.C-272 Absent Management
273 VI.C-273 Groundwater Quality Assessment for West Yangon Technological University Water Resources
274 VI.C-274 Portal Frame Design with Connection Structure
275 VI.C-275 Design and Analysis of Braced Tower Supporting Water Tank (Variable Soil) Structure
276 VI.C-276 Portal Frame Design with Connection Structure
277 VI.C-277 Portal Frame Design with Connection Structure
278 VI.C-278 Same Title with VI.C-161 Structure
279 VI.C-279 Waste Water Treatment Plant for Thingan Kyun Environmental
280 VI.C-280 Groundwater Quality Assessment for Hlaing Township Water Resources
281 VI.C-281 Design and Analysis of Three Storeyed R.C Building
(Foundation Type 2)
Structure
282 VI.C-282 Study on Public Safety Requirement for Mega Project Management
283 VI.C-283 Material Management of R.C Building Management
284 VI.C-284 Flexural Analysis of Beam Structure
285 VI.C-285 Study on Human Resource Management in Construction Project Management
286 VI.C-286 Studying on Irrigation System Water Resources
287 VI.C-287 Material Management of Six Storeyed R.C Building Management
288 VI.C-288 Overview of Construction Management for Four Units Five Storeyed R.C Building Management
289 VI.C-289 Study on Planning and Scheduling of Three Storeyed R.C Building Management
290 VI.C-290 Structural Design of Fourteen R.C Building Structure
291 VI.C-291 Invertigation on earthquake performance of 6storeyRC building Structure
292 VI.C-292 Study on Planning and Scheduling of Three and Half Storeyed R.C Building Management
293 VI.C-293 Analysis and Design of Deep Beam Structure
294 VI.C-294 Portal Frame Design with Connection Structure
295 VI.C-295 The Comparison of Hand Calculation and ETABS for Six-Storeyed R.C Building Structure
296 VI.C-296 Absent Structure
297 VI.C-297 Investigation of Earthquake Performance of Six Storeyed R.C Building Structure
298 VI.C-298 Comparative Study of R.C Structure under Various Seismic Zones Structure
299 VI.C-299 Design and Analysis of Four Storeyed R.C Building by Using ETABS Structure
300 VI.C-300 Analysis & Design of Six Storeyed  R.C Building Structure
301 VI.C-301 Design of Underground Water Tank Structure
302 VI.C-302 Study on Concrete Strength Material
303 VI.C-303 Study on Seismic Performance Comparison of Six-Storeyed R.C Building in Seismic Zone IIA and III Structure
304 VI.C-304 Study on Reduction of Construction Hazard by Safety Management System Management
305 VI.C-305 Analysis of  Solid Waste Management in Hlaing Township Environmental
306 VI.C-306 Design of Eight Storeyed Building in Different Seismic Zone Structure
307 VI.C-307 Study on Planning and Scheduling of Three Storeyed R.C Building Management
308 VI.C-308 Analysis and Design of Five Storeyed Reinforced Concrete Building Structure
309 VI.C-309 Time Planning and Delay Factors fo Mya Wutt Yee Road Construction Management
310 VI.C-310 Study on Labour and Safety Process in Construction Management
311 VI.C-311 Design and Analysis of Six Storeyed R.C Building Structure Structure
312 VI.C-312 Analysis and Design of Six Storeyed R.C Building (ETABS and SAFE) with Mat Footing Structure
313 VIC-313 Study on Safety Management in Construction Management
314 VIC-314 Design of Drainage Structure for Selected area in Yankin Township Environmental
315 VIC-315 Study on Importance of Safety Management for Construction Management
316 VIC-316 Design and Analysis of 3 Storey RCC Building (hand calculation) Structure
317 VIC-317 Study on Material Planning of Construction Management
318 VIC-318 Study on Occurrence of risk in Construction Management
319 VIC-319 Same Title with VIC 161 Structure
320 VIC-320 Comparative Study on Design of Gravity and Cantilever Retaining Wall Geotech
321 VIC-321 Analysis and Design of 7 Storey RC Structure in Alone Structure
322 VIC-322 Study on Planning and Scheduling of four units Two Storeyed Residential Building Management
323 VIC-323 Design of Two Stories Beam of Steel Structure Structure
324 VIC-324 Solid Waste Management For the Final Disposal site (Htein Pin) Environmental
325 VIC-325 Design of Ragid Pavement for Kyauk Yay Twin Road Transportation
326 VIC-326 Study on Planning and Scheduling of Nine Storeyed RC Building(Substructure) Management
327 VIC-327 The Comparison of Hand Calculation & ETABS for six Storeyed RC Building Structure
328 VIC-328 Time Planning of Thar Kay Ta Bridge Construction (substructure) Management
329 VIC-329 Study on Construction Safety and Health Management
330 VIC-330 A Case of Study foot Over Bridge (295ft)Design at Insein Railway Station Structure
331 VIC-331 Structural Design of Conduit Water Resources
332 VIC-332 Absent  
333 VIC-333 Comparative Study on Design of Isolated and Combined Footing for Two Storeyed RCC Building Geotech
334 VIC-334 Study on Quality Control Procedure in construction Management
335 VIC-335 Design of Elevated Water Tank Structure
336 VIC-336 Study on Job Analysis in Construction Management Management
337 VIC-337 Study on Design of Isolated Footing, Combined Footing & Strip Footing for Sixth Storeyed R.C Building Geotech
338 VIC-338 Study on Safety and Risk Management in Construction Management
339 VIC-339 Solid Waste Management in Selected Township Environmental
340 VIC-340 Study on Planning and Scheduling of Eight and Half Storeyed RC Building (Superstructure) Management
341 VIC-341 Water Assessment of Groundwater for drinking purpose for Kyimyindaing Township, Kayin National Ward Water Resources
342 VIC-342 Analysis of Solid Waste Composition Environmental
343 VIC-343 Analysis and Design of 7 Storey RC Structure in Alone Structure
344 VIC-344 Analysis & Design of Five Storey RC Building Structure
345 VIC-345 Study on Safety and Risk Management in Construction Management
346 VIC-346 Design of Isolate Footing and Strip Footing for Three Storey Steel Building Geotech
347 VIC-347 Same Title with VIC 60 Structure
348 VIC-348 Design of Isolate Footing and Strip Footing for Three Storey Building in South Okkalapa Geotech
349 VIC-349 Study on the Crop Water Requirements for Phyu Chaung Dam Water Resources
350 VIC-350 Labour Management of six Storeyed RC Building Management
351 VIC-351 Analysis & Design of Six Storeyed RC Building Structure
352 VIC-352 Safety Management for Construction Site Management
353 VIC-353 Study on Planning and Scheduling of Two Storeyed RC Building Management
354 VIC-354 Solid Waste Management for FDS (Hlawe Chaung) Environmental
355 VIC-355 Analysis & Design of Four Storeyed RC Structure with mat and strap Structure
356 VIC-356 Assessment of Scrviceability in 8th Storey Building Structure
357 VIC-357 Study on Safety Management in Construction Project Management
358 VIC-358 Study on Production and installation of Precast concrete Building Material
359 VIC-359 Study on Seismic Resistance Design of Reinforced Concrete Structure Structure
360 VIC-360 Same Title with VIC 316 Structure
361 VIC-361 Time Planning of Thar Kay Ta Bridge Constructure (Superstructure) Management
362 VIC-362 Design of Different Shape of Slab Structure
363 VIC-363 Comparetive Study 8 storey RC Structure under various Seismic Zone Structure
364 VIC-364 Design of Isolated and Strap Footings for Two storey Building Geotech
365 VIC-365 Same Title with VIC 297 Structure
366 VIC-366 Analysis and Design of Beam and Column for Ten Storey Building Structure
367 VIC-367 Study on Safety and Health in Construction Management
368 VIC-368 Study on Air Pollution for Selected Area in Yangon Environmental
369 VIC-369 Verification of Plastis stress Models for Local Timber Beam using small Clear Specimens Structure
370 VIC-370 Study on Material Management for 8th Storey RC Building Management
371 VIC-371 Analysis of Solid Waste Management and Disposal Environmental
372 VIC-372 Comparetive Study 8 storey RC Structure under various Seismic Zone Structure
373 VIC-373 Study on Air Pollution for Selected Area in Yangon Environmental
374 VIC-374 Same Title with VIC 299 Structure
375 VIC-375 Comparetive Study 8 storey RC Structure under various Seismic Zone Structure
376 VIC-376 Design & Construction of Superstructure of five storey RCC Building Structure
377 VIC-377 Study on Time Control Management for eight Storey RCC Building Management
378 VIC-378 Comparetive Study 8 storey RC Structure under various Seismic Zone Structure
379 VIC-379 Experimental Study on Physical Properties and CBR of soil in Alone and South Dagon Township Geotech
380 VIC-380 Study on Removal of Algae for Drinking water Environmental
381 VIC-381 Design of Isolated Footing for Three Storeyed R.C building in San Chaung Township Geotech
382 VIC-382 Study on the Behavior of Hydraulic Jump Water Resources
383 VIC-383 Case Study on Recyling of Waste Water in Star City Residence Environmental
384 VIC-384 Occurrence of Risk Construction Management
385 VIC-385 Same Title with VC 311 Structure
386 VIC-386 Study on Air Pollution for Selected Area in Yangon Environmental
387 VIC-387 Anlysis and Design of 2 storey RC Building Structure
388 VIC-388 Anlysis and Design of 3 storey Guest Hourse Structure
389 VIC-389 Study on Strength on Concrete Material
390 VIC-390 Analysis and Design of 7 Storey RC Structure in Alone Structure
391 VIC-391 Same Title with VIC297 Structure
392 VIC-392 Experimental Study on Mechanical  Properties of soil in Alone and Shwe Gonedine Township Geotech
393 VIC-393 Design of Rigid pavement,s thickness at labah mingin (% Transportation
394 VIC-394 Study on Precast Pile Foundation Design for 8-1/2 Storeyed R.C.C Building in Thingangyun Township Geotech
395 VIC-395 Labour and Material Management forThar Kay Ta Bridge Construction Management
396 VIC-396 Various Stair Case Structure
397 VIC-397 Design of Septic Tank for 6 units with 3 Storey RC Building Environmental
398 VIC-398 Analysic and Design of  6 Storey RC Structure with Mat and Strap Structure
399 VIC-399 Experimental Study on Properties of Cement Stabilized Cohesive Soil Geotech
400 VIC-400 Design Water Supply and Sewage System 8 Storey Environmental
401 VIC-401 Same Title with VIC 60 Structure
402 VIC-402 Torsional Effect of Structural Analysis of Super Structure Structure
403 VIC-403 Future Plan of Greenbelt Design for Yangon Environmental
404 VIC-404 Analysis and Design of 3 Storey of RC Building with Strap and Mat in Hlaing Tharyar Structure
405 VIC-405 Design of Steel stresses and Steel Beam for two Strorey School Structure
406 VIC-406 Material Management of 8 Storey RC Building Management
407 VIC-407 Same Title with VIC115 Structure
408 VIC-408 Study on Employee's safety and Health for 6 Storey Building Management
409 VIC-409 Costruction Planning and Process of Three Storey RCC Building Management
410 VIC-410 Investigation of Earthquake Performance of Six Storeyed R.C Building Structure
411 VIC-411 Design of Separated Sewage System 20 Storey Building Environmental
412 VIC-412 Analyzing Water Distribution Network Design for 15+16 Quarters (Yankin Township) Water Resources
413 VIC-413 Study on Material Management for 8th Storey RC Building Management
414 VIC-414 Slope Stability Check in Yazagyo Dam, Kalay Township Water Resources
415 VIC-415 Same Title with VIC 410 Structure
416 VIC-416 Design of Solid Slab and Flat for 10 Storey RC Building Structure
417 VIC-417 Design of Rigid Pavement's thickness ft Ram Bree-Kyauk Ni Maw Road In Rakhine State Transportation
418 VIC-418 Analysis and Design of 6 Storey of RC Building Structure
419 VIC-419 Green Building for Hospital Environmental
420 VIC-420 Analysis and Design of 5 Storey of RC Building Structure
421 VIC-421 Study on Employee's Health and Safety for 6 Storey RC Building Management
422 VIC-422 Same Title with VIC 161 Structure
423 VIC-423 Design of Sewage System and Septic Tank For 6 Storey Environmental
424 VIC-424 Study on Structural analysis and Design of 7 Storey of RC Building Structure
425 VIC-425 Design of Drainage Stystem for Selected Area in Botahtaung Environmental
426 VIC-426 A Case Study of Food Over Bridge 295 ft NO.2 Insein Railway Station Structure
427 VIC-427 Design of pressed Pile Foundation of RCC Building in Mayangone Township Geotech
428 VIC-428 Comparison on Exsistig and Future Water Distribution System Environmental
429 VIC-429 Design of Sluice Gate in Tidal Area (Yinn Nyein Sluice) Water Resources
430 VIC-430 Design of Water Supply System for multi-storeyed building Water Resources
431 VI.C-431 Study on Planning and Scheduling of Twenty Two and Half Storyed RC Building (Sub Structure) Management
432 VI.C-432 Design of Wastewater Treatment System for VE VE Soft Drink Industry Environmental
433 VI.C-433 Analysis and Design of 4 Storey RC Structure with mat and strap Structure
434 VI.C-434 Same title with VIC-311 Structure
435 VI.C-435 Study on Risk Management of Twelve Storeyed RC Building Management
436 VI.C-436 Review and Analysis about 'Mean of Egress Management
437 VI.C-437 Study on Behavior of Precourse Cocrete Building Design Structure
438 VI.C-438 Risk Analysis of Project Management Management
439 VI.C-439 Absent Geotech
440 VI.C-440 Study on Safety and Health in Costruction Site Management
441 VI.C-441 Analysis and Design of 7 Storey RC Structure in Alone Structure
442 VI.C-442 Design and Analysis of 4 Storey RC Building for Superstructural and Substucture Structure
443 VI.C-443 Time Planning in Construction Management
444 VI.C-444 Same title with VIC-410 Structure
445 VI.C-445 Study on Time Management in Construction Management
446 VI.C-446 Same title with VIC-410 Structure
447 VI.C-447 Analysis and Design of 3 Storey School Building Structure
448 VI.C-448 Study on Planning and Scheduling of Three Storyed Steel Structure Building Management
449 VI.C-449 Same title with VIC-410 Structure
450 VI.C-450 Absent  
451 VI.C-451 A Case Study of Composite Beam in Composite Multi-Story Building Structure
452 VI.C-452 Study on Occuptional Safety and Health at Construction Site Management
453 VI.C-453 Design of Isolated and Strip Footings of Three Storyed Building Geotech
454 VI.C-454 Analysis and Design of 5 Storyed R.CC Building Structure
455 VI.C-455 Surface Water Quality Test for Inya Lake Water Resources
456 VI.C-456 Study of Structural Analysis and Design of 7 Stories RC Building Structure
457 VI.C-457 Comparative Study of RC Structure under Various Seismic Zones Magway & Yangon(Thanlwin) Structure
458 VI.C-458 Design Water Tank and Plumbing System of Six Storyed R.C.C Building Environmental
459 VI.C-459 Analysis and Design of Water Tank Structure
460 VI.C-460 Study on the Structural Analysis by using Moment-Distribution Method Structure
461 VI.C-461 Analysis of Pratt Truss(N-Girder) 120 ft No-1 Da Nyan Gone Railway Station Foot over Bridges Structure
462 VI.C-462 Repair and Strengthening of Concrete Structure Structure
463 VI.C-463 Design and Analysis of 6 Storey RC Building Structure
464 VI.C-464 Analysis of Solid Waste Management in Kamayut Township Environmental
465 VI.C-465 Same title with VIC-297 Structure
466 VI.C-466 Experimental Study on Properties Soil for Road Constructioon in South Okkalapa Township Geotech
467 VI.C-467 Study on Design of Pressed Pile Foundation(Spun Pile) Geotech
468 VI.C-468 Analysis of Spillway and Design of Spillway for Kadaik Dam Water Resources
469 VIC-469 Study on Planning and Scheduling of Three Storeyed R.C.C Building Management
470 VIC-470 Testing Materials for Concrete Mix Design Material
471 VIC-471 Study on Safety Management in Construction Management
472 VIC-472 Solid Waste Management in Botahtaung Township Water Resources
473 VIC-473 Study on Water Distribution Design and Sewage System Environmental
474 VIC-474 Labour Management Construction Management
475 VIC-475 Design of Flexible Pavement for Tarmoenyae - Milebne-Tatkanaing Shan State Transportation
476 VIC-476 Design of Kadaik Dam Water Resources
477 VIC-477 Same Title with VI.C-316 Structure
478 VIC-478 Study on Safety Management  for three storeyed RC Building Management
479 VIC-479 Comparative Study of RC frame for 8 storeyed Building Structure
480 VIC-480 Design and Analysis of Conposite Beam and Slab in Two Storeyed Composite Building Structure
481 VIC-481 Analysis and Design of 3 storeyed RC Building Structure
482 VIC-482 Study on Planning  and Scheduling of 12 Storeyed Penisular Plaza (Super Structure ) Management
483 VIC-483 Analysis of Solid Waste Management in Mingalar Taung Nyunt Township Environmental
484 VIC-484 Wastewater Treatment Plant in Hlaing Township Environmental
485 VIC-485 A case study of composite column in two storeyed building Structure
486 VIC-486 Design of water supply and sewage system for six storeyed R.C.C Building Environmental
487 VIC-487 Disintegration of AC road and Their Maintenance Transportation
488 VIC-488 Analysis of Beam - Column Joint in RC Structure Structure
489 VIC-489 Shear Analysis and Design of Reinforced Concrete Beam Structure
490 VIC-490 Detail Design of Beam for Different Types of Frame System Structure
491 VIC-491 Design of Isolated and Combined Footings for 5 storeyed R.C.C Building Geotect
492 VIC-492 Time scheduling for Construction Management
493 VIC-493 Labour Planning and Project Scheduling for 3 Storeyrd R.C Building Management
494 VIC-494 Analysis and Design of 6 storeyed Commercial RC Building  
495 VIC-495 Green Infrastructure Structure
496 VIC-496 Experimental Study on Soil Stabilization Using Cement for Road Construction Environmental
497 VIC-497 Study on Standard Code for Accessible Public Spaces Geotect
498 VIC-498 Design of Shear wall in 10 Storeyed Building Transportation
499 VIC-499 Desin of Drainage System Structure
500 VIC-500 Different Types of R.C.C Stairs Design by Hand Calculation Environmental
501 VIC-501 Design of Wastewater Treatment of M- Tower Project ( 4 basement + 26 storeyed Steel Structure) Structure
502 VIC-502 Same Title with VI.C-311 Environmental
503 VIC-503 Desin of Traffic Signal at the Intersection of Kabaraye Pagoda Road and Sayarsan Road Transportation
504 VIC-504 Study on Design of Mat and Isolated Footings Geotect
505 VIC-505 Labour Management of 8 storeyed R.C Building Management
506 VIC-506 Design of Strip Footing for  R.C.C Building Geotect
507 VIC-507 Design of Strip Footing for 4 storeyed R.C.C Building Structure
508 VIC-508 Study on Health and Safety at Workplace Managenent
509 VIC-509 Study on Scheduleing of RC Building Managenent
510 VIC-510 Design of Driven Pile Foundation for High-Rise RC building inThinggangyun towndhip Geotech
511 VIC-511 Compareative study on Design of Isolated Footing Combined and Mat Foundation for
Three-Storyed Bank Project
Geotech
512 VIC-512 Design of Khayan Lock Gate Water Resources
513 VIC-513 Design of Bored Pile foundation for 40 ft span Bridge Project Geotech
514 VIC-514 Analysis and Design of Three-storyed Hospital Building Structure
515 VIC-515 Analysis and Design of Sub-structure foreight and half storyed Structure
516 VIC-516 Study on Construction safty and health Managenent
517 VIC-517 Design and analysisi of Four-stored RC building (Hand Calculation) Structure
518 VIC-518 Analysis of Solid waste composition and Energy for slected town ship in Yangon Emvironment
519 VIC-519 Repair and straengthening of concrete structure Structure
520 VIC-520 Analysis of Pratt Truss (N-Girder) 120 ft No-1 Insein Railway Station foot over Bridge Structure
521 VIC-521 Study on Labour Planning of Sixth Storeyed R.C Building Managenent
522 VIC-522 Same Title with VI-C281 Structure
523 VIC-523 Study on Design of Press pile Foundation (Square Pile) Geotech
524 VIC-524 Study on Design of Press pile Foundation Geotech
525 VIC-525 Absent  
526 VIC-526 Absent  
527 VIC-527 Study on Safty and Health in Construction Site Managenent
528 VIC-528 Same Title with VI-C-311 Structure
529 VIC-529 Design of Water Supply System and Sewage System for Nine-storyed Emvironment
530 VIC-530 Study on Plannig and Scheduling of Sub-structure for Eight-storyed residential Building Managenent
531 VIC-531 Study on Occupational health and Safty Enviroment Managenent
532 VIC-532 Repair and straengthening of concrete structure  
533 VIC-533 Analysis and Design of Strip Footing and Combimed footing Geotech
534 VIC-534 A case of Study of foot over Bridge 295 ft No.2Insein railway ststion Structure
535 VIC-535 Desin of separated sewage system for three storeyed RC Building Emvironment
536 VIC-536 Study on Labour and Equipment planning of Concrete road construction Managenent
537 VIC-537 Analysis and design of Cyclone Shelter of Rakhing State Structure
538 VIC-538 Analysis of Pratt Truss (N-Girder) 120 ft No-1 Insein Railway Station foot over Bridge Structure
539 VIC-539 Study on Construction safty and health Managenent
540 VIC-540 Analysis and Design of Isolated Footing by Unsing ETABS and SAFE SOFTWARE Geotech
541 VIC-541 The Compareative of Hand Calculated and ETABS for sixth Storeyed RC Building Structure
542 VIC-542 Design of Water Supply System and Sewage System for third-storyed Emvironment
543 VIC-543 Study on Identification of RISK Level in Construction Managenent
544 VIC-544 Absent  
545 VIC-545 Design of Drainage System for Selected Area in Insein Emvironment
546 VIC-546 Study on the transpotation about level of Service for four multi-lane of Parami Road Transporation
547 VI.C-547 Planning and scheduling of three storyed residential building Management
548 VI.C-548 Deign of isolated footing and strip footing for Two storey RC buiding Geotech
549 VI.C-549 Study on planning and scheduling of two storey RC building Management
550 VI.C-550 Deign of isolated footing and strip footing for two storey RC buiding Geotech
551 VI.C-551 Study on planning and scheduling of four unit five storey RC building Management
552 VI.C-552 Study on concrete compressive strength Material
553 VI.C-553 Comparative study of different types of foundation 5 storey RC building Structure
554 VI.C-554 Design constuction of rigid pavement for Teik Kyi Ou to and Aphyauk Road Transportation
555 VI.C-555 Study on Planning and Scheduling for Sixth Storeyed R.C Building Management
556 VI.C-556 Study on planning and scheduling of two storey RC building Management
557 VI.C-557 Analysis and Design of 6  storey RC building Structure
558 VI.C-558 Absent Management
559 VI.C-559 Design of flexible pavement for Poum High Mine Yinn Road Transportation
560 VI.C-560 Comparative study on Deign of isolated footing and strip footing for two storey Rc buiding Geotech
561 VI.C-561 Comparative study on Deign of isolated footing and strip footing for three storey Rc buiding Geotech
562 VI.C-562 Comparative study on bearing capacity calculation of pile foundation and static loading test Geotech
563 VI.C-563 Analysis and Design of school cum shelter Structure
564 VI.C-564 Study on planning and scheduling of two storey RC building Management
565 VI.C-565 Analysis and Design of cyclone shelter for Rakhine state Structure
566 VI.C-566 Study on planning and scheduling of three and half storey RC building Management
567 VI.C-567 Analysis of solid waste composition and energy recovery for selected township in Yangon Environmemt
568 VI.C-568 Planning and scheduling of shaft housing (6 unit) Management
569 VI.C-569 Material planning of six storey RC building Management
570 VI.C-570 Study on health and safety at construction site Management
571 VI.C-571 The comparison of hand calculation & ETABS for six storeyed RC building Structure
572 VI.C-572 Design of rigid pavement for Okkala Road Transportation
573 VI.C-573 Labour planning of eight  storeyed RC building Management
574 VI.C-574 Culvert design and types Structure
575 VI.C-575  Deign of isolated footing and strip footing for four storey Steel buiding Geotech
576 VI.C-576 Experimental study on pysical properties of clayed soils in Yangon Geotech
577 VI.C-577 Study on air pollution for selected area in Yangon Environmemt
578 VI.C-578 Design construction of rigid pavement for Sulaali Sakhan thit Road Transportation
579 VI.C-579 Design of steel structure for two storeyed building Structure
580 VI.C-580 Flood Attenuation by Exploiting Kandawgyi Lake as a Detention Pond Water Resources
581 VI.C-581 Design of rigid pavement for Kyauk Ni Maw-Laung lone Road  
582 VI.C-582 Analysis of solid waste composition and energy recovery for selected township Environmemt
583 VI.C-583 Analysis and Design of 4 storey RC structure with mat and strap Structure
584 VI.C-584 Design of Traffic signals at the interrsecction of Min Ye Kyaw Swar Road and Pyay Road Transportation
585 VI.C-585 Anaiysis of Praff truss (N-Girder) 120 ft No-1 Insein railway station foot over bridge Structure
586 VI.C-586 Design of rigid pavement for Dala Thakhtut Latkhate Rone KaNyinKane Road Transportation
587 VI.C-587 same title with VI.C-52 Structure
588 VI.C-588 Analysis of Slender column with or without bracing Structure
589 VI.C-589 Anaiysis of Praff truss (N-Girder) 120 ft No-1 Da Nyan Gone railway station foot over bridge Structure
590 VI.C-590 Study on construction safety and health of workplace Management
591 VI.C-591 Design construction of flexible pavement for Panhigh Mineyin SHAN state Transportation
592 VI.C-592 Anaiysis of Praff truss (N-Girder) 120 ft No-1  railway station foot over bridge Structure
593 VI.C-593 Study on construction safety and health Management
594 VI.C-594 Planning and scheduling of Staff housing Management
595 VI.C-595 Labour and equipment planning of twelve  storeyed RC building Management
596 VI.C-596 Absent Geotech
597 VI.C-597 Study on Planning and scheduling for 100 bedded hospital Management
598 VI.C-598 Concrete admixture mix design Material
599 VI.C-599 Design and analysis of RC beam in slab in six storey building Structure
600 VI.C-600 Design of Flexible pavement for Yangon-Myeil highway (Thanbyuzayat-Ye Portion) Transportation
601 VI.C-601 Design of shear wall Structure
602 VI.C-602 Analysis and design of two storey Educational building Structure
603 VI.C-603 Structural analysis using virtual work method Structure
604 VI.C-604 Study on Planning and scheduling for four stored RC building Management
605 VI.C-605 Absent Management
606 VI.C-606 Analysis on air pollution for selected township in Yangon Environmemt
607 VI.C-607 Repair and strengthening of concrete structure Structure
608 VI.C-608 Study on Planning and scheduling for four stored RC building Management
609 VI.C-609 Absent  
610 VI.C-610 Deign of isolated footing and strip footing for Two storey Rc buiding Geotech
611 VI.C-611 Comparative study on Deign of isolated footing and mat foundation for three storey car showroom Geotech
612 VI.C-612 Timber formwork Structure
613 VI.C-613 Analysis of solid waste composition and energy recovery for selected area Environmemt
614 VI.C-614 Parametric design of mat foundation for eight storyed RC building Geotech
615 VI.C-615 Design of drainage system for selected area in kyeemyint Dine Environmemt
616 VI.C-616 Design of waste water treatment for selected area in Botahtaung Environmemt
617 VI.C-617 Analysis and design of three storey RC building Structure
618 VI.C-618 Deign of isolated footing and strip footing for two storey Rc buiding Geotech
619 VI.C-619 Comparative study on RC structure under various seismic zones Structure
620 VI.C-620 Study on the design of RC footing Structure
621 VI.C-621 Analysis of Dam Failures and Development of Dam Safety Water Resources
622 VI.C-622 Design of rigid pavement for Yanbyel kyaut ni maw Road Transportation
623 VI.C-623 Analysis and design of column footing Structure
624 VI.C-624 Study on Planning and scheduling for two stored RC building Management
625 VI.C-625 Study on design of isolated and mat foundations for five storeyed RC Building Geotech
626 VI.C-626 Investigation of safety practices for penisular tower Management
627 VI.C-627 Design of timber formwork for slab, beam and column Structure
628 VI.C-628 same title with VI.C-297 Structure
629 VI.C-629 Study on Deign of isolated footing and combined footing for four storey RC buiding Geotech
630 VI.C-630 Analysis and design of slab and beam Structure